Haffner Energy Launches CORE100, Industrial Unit Reservation Program
Haffner Energy has announced the launch of CORE100, a reservation program for 100 standardized C-iC industrial units, targeting a business volume of over 300 million euros over three years. This program aims to structure the company's order book for the period 2026-2029.
Cost Reduction and Standardization
CORE100 is designed to reduce capital costs for mid-sized decentralized projects that face excessively high expenditure levels to remain competitive. The program is based on the serial manufacturing of 100 standardized units capable of producing either 50 kg/h of hydrogen (400 tons per year) or 1,700 kWh of syngas for the production of methanol or methane, as well as thermal energy. The offer is limited to countries aligned with ISO standards, the metric system, and a 50 Hz electrical frequency, covering Europe and North Africa. The combined effect of serial industrialization and modularity allows for a reduction in production costs.
Reservation Period and Conditions
The reservation period runs from February 18 to July 30, 2026. Each reservation requires a deposit of 10,000 euros held by an independent notary in Switzerland. The deposits will only be transferred to Haffner Energy if the program reaches 100 confirmed reservations and the financing of the projects is secured. Once confirmed, the program will commence production according to a three-year structured industrial schedule. Clients who reserve during earlier periods will have access to earlier production slots, with capacities fully utilized until 2029.