IBA: equipment orders up 24%, net debt rises to €117M at end of September
On November 26, 2026, IBA published its third-quarter activity review. Equipment order intake reached €242M, up 24% year on year, and the group confirmed its guidance of adjusted EBIT of at least €32M for 2026.
Meanwhile, net debt rose from €81M at June 30 to €117M at September 30, with €35M of revolving credit facilities drawn. The group links this increase to working capital requirements and indicates a return to €100M at October 31.
Order growth is driven by IBA Clinical, up 39%, while IBA Technologies orders fell 8%. The order backlog, meanwhile, remains stable at €1.6bn.
Orders up 24%, backlog stable at €1.6bn
The order backlog breaks down into €0.71bn of equipment and €0.87bn of services. According to IBA, it is fueled by new operation and maintenance contracts in proton therapy, as well as service renewals within an installed base that is growing and included 48 active sites at the end of the quarter.
In proton therapy, 45 projects are in the equipment backlog (6 Proteus PLUS and 39 Proteus ONE), including 11 being installed. Six Proteus ONE systems have been sold since the start of the year, compared with four at the end of the third quarter 2025, including the one for IFO in Rome.
Olivier Legrain, chief executive officer, believes that “our order backlog provides good visibility” and that this “strengthens our confidence in our ability to achieve the 2026 guidance.”
IBA Clinical drives growth, Industrial Solutions weighs on it
Orders at IBA Clinical rose 39%, and those at Dosimetry rose 13%, mainly driven by conventional radiotherapy. At the half-year results published on August 27, 2026, the group had indicated that Dosimetry remained under pressure despite its cost-reduction measures; it now specifies that their first effects are beginning to materialize.
The chief executive cites “sustained demand across all our segments.” In value terms, IBA Technologies orders nonetheless fell 8%, as the momentum at RadioPharma Solutions did not fully offset a more moderate year at Industrial Solutions, an activity for which IBA cited, at the end of August, persistent market overcapacity.
In volume terms, the division sold 25 systems since the start of the year, compared with 18 a year earlier, including an order for 12 Cyclone KIUBE 300 cyclotrons in the United States. After the period end, Industrial Solutions signed an electron beam sterilization contract in Germany and a first contract for its Rhodotron LITE in China.
Net debt up at September 30, adjusted EBIT guidance confirmed
IBA attributes the increase in its net debt to the timing of cash collections linked to project progress and to the increase in inventories related to projects and services. The group anticipates an acceleration of collections in the fourth quarter of 2026, followed by a gradual improvement in its net financial position from the second half of 2027.
On profitability, IBA considers its performance since the start of the year in line with adjusted EBIT of at least €32M in 2026, and maintains its long-term target of an adjusted EBIT margin of around 10%.
Outside its historical activities, the final tranche of the PanTera capital increase, expected by the end of the year, should bring IBA's stake to approximately 31% and generate a revaluation gain. The group has also launched two joint ventures, Ekalia with Framatome in astatine-211 and Noventra with Penn Medicine.
The activity update thus combines higher equipment orders, driven by IBA Clinical, with net debt increased by working capital requirements, which the group plans to reduce with fourth-quarter collections.
